Projects

VA - Outpatient Service Improvements

The scope of this project involved renovations to the existing Outpatient Care Lobby / Patient Care Administration, Outpatient Pharmacy and VA Police command center. Construction was performed in five phases to ensure uninterrupted operation of the Outpatient Pharmacy during construction.
The project consisted of renovations and additions to the existing hospital, including demolition of exterior bituminous asphalt surfaces, gratings, exterior CMU walls and brick façade.  Interior demolition included removal of structural concrete, existing plaster walls and finishes, selective mechanical, electrical and plumbing demolition and asbestos abatement.  New construction included site excavation and grading, installation of new structural concrete grade beams, concrete slab on grade, structural steel, exterior and interior masonry CMU walls and new EPDM roof system. Interior construction consisted of modifications to the existing mechanical system including sprinkler system, electrical upgrades and renovations, interior partitions and finishes including ATC ceilings, doors and hardware, painting, interior casework and flooring. The project consisted of approximately 18,500 GSF of interior and exterior renovations and new additions.
Stacks Image 1852

PROJECT DESCRIPTION

RBVetCo self-performed construction including site excavation, cast-in-place structural concrete (including reinforcing steel placement and concrete flatwork).

Demonstrates the ability to manage subcontracts such as structural steel, large mechanical system upgrades, electrical system upgrades and interior/exterior finishes.

Construction took place within very difficult operating conditions that included time, scheduling, logistic and environmental restraints.

This project was phased renovation construction, where major departments, such as the Outpatient Pharmacy were kept fully operational during construction phasing.  The area or departments that were kept operational were critical for patient care thus making construction for this project challenging, illustrating RBVetCo’s ability to complete extremely difficult projects. 

PROJECT INFORMATION

Structure's Use:
Medical Facility
Inpatient Facility
Outpatient Services
Project Involved:
Sitework
Utility Upgrades
Addition to Facility
Renovation Work
Demo/Abatement
Infectious Controls
Size:
18,500 SF
Number of Levels:
1
Foundation Type:
Grade Beam / SOG
Contracting Method:
Design-Bid-Build
Project Start:
December 2006
Completion Date:
October 2007
Project Cost:
$1,000,000 - $3,000,000