• Stacks Image 9432

    Caption Text

    Link
  • Stacks Image 9433

    Caption Text

    Link
  • Stacks Image 9434

    Caption Text

    Link
  • Stacks Image 9455

    Caption Text

    Link

Projects

VA - RENOVATE 4 EAST FOR SICU

The scope of this project involved demolition, asbestos abatement and construction of a new SICU facility on the fourth floor of the VAPHS.
The project consisted of the renovation of approximately 8,300 GSF of fourth floor space for a new SICU, including demolition of interior mechanical, electrical, plumbing, walls and ceilings, and asbestos abatement. New construction included new mechanical, electrical and plumbing systems (including sprinkler system), medical gas system, interior walls and ceilings, roof mounted equipment, emergency panel electrical upgrade, a new nurse call system with intercom and video surveillance, painting, inheritor casework and flooring.
Stacks Image 2220

Project Description

Demonstrates the ability to manage MEP subcontracts such as   mechanical system upgrades, electrical system upgrades and interior/exterior finishes.

RBVetCo worked closely with the project COTR to coordinate specialty work throughout the project to complete the work within projected time frames, despite delays caused by unforeseen conditions.

The new SICU is a state-of-the-art facility that represents the construction management skills required to compete a technically complex project within a hospital environment.

PROJECT INFORMATION

Structure's Use:
Medical Facility
Inpatient ICU
Facility
Project Involved:
Utility Upgrades
Renovation Work
Demo / Abatement
Infectious Controls
Size:
8,300 SF
Number of Levels:
1
Contracting Method:
Design-Bid-Build
Project Start:
November 2009
Completion Date:
September 2010
Project Cost:
$2,000,000 - $5,000,000