VA - GROUND FLOOR SHELL-IN SPACE

RBVetCo was contracted by the VA to complete this project as a design-build negotiated contract.  The design of this space included a new data, electrical, sprinkler, HVAC system and raised flooring. RBVetCo was responsible for hiring the Architect and Engineering firms to complete the design according to the baseline requirements set forth by the VA Hospital. With the completion of the design, RBVetCo self performed the demolition and installation of the interior carpentry while subcontracting the painting, electrical, HVAC and the raised floor system.

This was an interior renovation of a space that will be used as a swing space and will serve as a temporary home for any VA department that is currently under construction.  The floor is a mechanical raised floor system that is set eight inches above the existing concrete slab on grade.  This raised floor system allows access to the data and power lines that run beneath for future changes in the room’s furniture layout.  
Stacks Image 2215

Project Description

This project included a tight timeline and was constructed in a fast track manner

Construction included Demolition, HVAC, Elec/data, Finishes, Fire Suppression and Flooring.

This was constructed in a VA hospital’s office area.

ICRA requirements were adhered to throughout the project and specifically during demolition of the walls separating this space from the corridors.

PROJECT INFORMATION

Structure's Use:
Medical Facility
Use:
Inpatient Facility
Outpatient Facility
Project Involved:
Sitework
Utility Upgrades
Addition to Facility
Renovation Work
Demo / Abatement
Infectious Controls
Size:
2,500 SF
Contracting Method:
Design-Build
Project Start:
September 2008
Completion Date:
March 2009
Project Cost:
$500,000 - $1,000,000